Response to contamination from fire-damaged asbestos materials — a structured approach

QED Environmental Services

By Dave Collins
Monday, 19 February, 2018


Response to contamination from fire-damaged asbestos materials — a structured approach

In the unfortunate event of fire in a property containing asbestos it is essential to undertake a measured and structured response to ensure the safety of all involved, as well as the safety of the wider public.

Depending on the scale of the fire there may be considerable potential for asbestos to be spread well beyond the building involved, usually in a friable form.

This risk of contamination spreading on a very large scale means that numerous state and local agencies will be required to be involved, as the concern for the safety and wellbeing of the general community becomes the priority.

Having a robust response and management process is essential. An example of the process that QED uses to minimise risk and ensure the safety of those that fall within the contaminated area is detailed below.

The size and ferocity of the fire, as well as the direction and speed of the prevailing winds, will dramatically impact the affected area and should be taken into account when calculating the potential risk for the surrounding area.

Case study: West Perth warehouse fire

In 2016, a toxic blaze ripped through a warehouse located in the densely populated suburb of West Perth. QED was called to assist with the assessment and remediation process.

Initial measures and site assessment

QED’s initial assessment of the affected area comprised visual inspections and tape tests.

Tape samples were taken from various surfaces around the laneway area adjacent to the warehouse. This included surfaces that may have been contaminated with airborne fibres from the smoke plume, or exploding asbestos cement sheeting at the source of the fire. The company also examined walls, fences, bins and car surfaces.

Tape sampling procedure consists of attaching the tape to the surface, peeling off, folding over and sealing in a bag. The company  then sends these samples to the lab for testing and a report of the results is returned.

While the tape test showed no asbestos was detected on this outlying area in this case, asbestos fibre cement debris was visibly observed within the laneway and in the children’s play area and swimming pool area of a nearby apartment hotel.

When dealing with a fire that presents a genuine risk of asbestos contamination it is essential to consider all potential areas of impact. For instance, the road drains nearby will receive water runoff from the firefighting efforts and these may contain minor amounts of asbestos. In this particular case, QED tested the drains and concluded that the risk to public exposure of asbestos was negligible.

QED recommended that any future Job Safety Assessment (JSA) for workers that needed to access the drains included the possibility that minor amounts of asbestos material may be present along with potential risks from other chemicals, and that the required personal protection equipment (PPE) should take this into consideration.

Safety of the workers responding to the incident and undertaking the clean-up is imperative.

Appropriate measures and personal protection equipment (PPE) are required for any contractors during the cleaning.

Site remediation

Once the initial assessment has been completed, the clean-up phase begins and all efforts are taken to safely remove the asbestos that remains in the contaminated areas.

The remediation process starts with the clean-up of all visible debris by a licensed asbestos removalist. This is generally done using an asbestos-rated vacuum cleaner. A 5-metre exclusion zone is established (where possible) to restrict public access during the removal process.

Site validation

Once the site remediation has been completed, the company moves into the validation stage, where final tests are carried out to ensure the contaminated area is now completely free of asbestos.

This stage of the process usually includes a comprehensive visual inspection of the area. In this case it included the laneway and children’s play area and swimming pool area of the hotel.

Following visual confirmation of the clean-up, tape samples were taken from surfaces within the children’s play area, the swimming pool area and on the roof of the hotel to ensure the areas were now safe for public use.

Once the final results are in and the area is deemed safe, a clearance certification is issued by the consultant confirming details of the validation check and the outcome.

In this case, all outdoor furniture within the hotel pool and children’s play areas was also wiped down and asbestos fragments within the pool were also physically removed.

The company also recommended seeding the pool with a flocculent, running the pool pump and filtering the sand-filter backwash before discharging to the sewer to ensure the pool was safe for use.

Finally, to ensure the site was left completely safe, QED also advised cleaning of all low-level roofs within the hotel areas.

When carrying out the remediation process it is important to employ an asbestos removal contractor with an unrestricted licence. In this case, all clean-up works were carried out in accordance with the Code of Practice for the Safe Removal of Asbestos 2nd Edition [NOHSC:2002(2005)].

Once the final results are in and the area is deemed safe, a clearance certification is issued by the consultant confirming details of the validation check and the outcome.

Where to now?

An effective response strategy to contamination from fire-damaged asbestos materials can minimise potential risks to the general public and ensure state and local authorities are confident they can act accordingly to serious public health issues.

QED recommends placing an emphasis on agencies working together effectively and efficiently, as well as following these the simple steps:

  1. Review and evaluation of the response and report.
  2. Affected areas defined quickly.
  3. Action plan developed and implemented quickly.

For more information on managing the risks presented by asbestos contamination visit www.qed.com.au.

Image credit: ©stock.adobe.com/au/Kim Britten

Related Articles

Robot dog can 'sniff' hazardous gases in inaccessible environments

To keep humans out of harm's way, researchers have created a four-legged, dog-like robot that...

Preventing accidents with thermal fluid safety protocols

How can health and safety protocols contribute to a safer and more effective work environment...

Toxic ammonia gas 'sniffed out' by sensor

A small ammonia gas sensor that could enable safer hydrogen storage has been developed by...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd